The Microprocessor Controlled Aerial Robotics Team, or MicroCART, has been building aerial robots at Iowa State University since 1998. Our team is improving the quality and ease of quadcopter research in the following ways:


Creating a more reliable and intuitive system for students taking CPRE 488, and improving system based on student feedback.


Implementing a quadcopter research platform with a multicore processor to show interesting demos to prospective ISU students.


Improving documentation for future teams and other researchers through wiki pages and YouTube videos.


Senior Design Project Poster

Example Image

Link to MicroCart YouTube Channel


(Link to 492 Midterm Report Video)


Final Project Demonstration Video

MP-4 Improvements

Machine Problem 4 (MP-4) is a lab delivered within the CPRE 488 Embedded Systems Design course. This lab aims to teach students about the basics of control systems theory as well as to help build more general skills pertaining to embedded systems. A task for this year's team was to complete the lab and search for ways to improve both the infrastructure and workflow for students taking CPRE 488.

Fly-Pi Development

The second largest aspect of our project deals with programming a Raspberry Pi in order to drive the firmware within the drones we are currently using for class labs and research. A big portion of the work in need of completion this semester pertains to the need to figure out how to partition the four cores on the Raspberry Pi in order to run two operating systems at once (BareMetal and FreeRTOS)

Team Members

Justin Kenny

Scribe

Software Engineer

Trevor Friedl

Project Manager

Computer Engineer

Steve Frana

Technical Lead

Computer Engineer

Will Maahs

Team Organization Lead

Computer Engineer

Clayton Kramper

Technical Lead

Computer Engineer

Travis Massner

UI/UX Designer

Software Engineer





Weekly Reports:


Fall 2023 Weekly Status Reports

Weekly Report Week 5
Weekly Report Week 6
Weekly Report Week 7
Weekly Report Week 8
Weekly Report Week 9
Weekly Report Week 10
Weekly Report Week 11
Weekly Report Week 12
Weekly Report Week 13
Weekly Report Week 14
Weekly Report Week 15
Weekly Report Week 16

Spring 2024 Weekly Status Reports

Weekly Report Week 17
Weekly Report Week 18
Weekly Report Week 19
Weekly Report Week 20
Weekly Report Week 21
Weekly Report Week 22
Weekly Report Week 23
Weekly Report Week 24
Weekly Report Week 25
Weekly Report Week 26
Weekly Report Week 27
Weekly Report Week 28
Weekly Report Week 29




Design Documents

Final Fall 2023 Design Document
Fall 2023 Design Review Powerpoint
Spring 2024 Midterm Report Presentation
Spring 2024 Final IRP Presentation
MicroCART Final Design Poster
Spring 2024 Final Report